Index Page for 2021
Welcome to our GTM Libra Build, on the road from 1st June 2000, Refurbished April - July 2011, further work done in 2017, in March 2018 the engine blew a cylinder head gasket & dumped its cooling fluid into the sump. Story on page 5. Latest update 14/01/2019.
Click to Contact Us.
The "next" & "back" buttons allow you to visit each page in turn. "exit" returns to the main web page, "home" returns to this page.Page 1 - Our origional Libra build info'
Page 2 - Fuel gauge, tank info' & Dash Wiring
Page 3 - LED lighting - Continued from page6
Page 4 - Cooling system/fuel tank/fuel gauge etc
Page 5 - Rover 1.8vvc engine/repair
Page 6 - LED lighting - update December 2018
Page 7 - Heater fan speed control
Page 8 - Fitting air horns
Page 9 - 1.8vvc engine plugs - wiring
Page 10 - Refurbishing suspension
Page 11 - Refurbishing suspension
Page 12 - Other tips - starting & engine mounts
Page 13 - Empty
Page 14 - Empty
Page 15 - Oil filter protection sleeve
Page 16 - PG1 Gearbox Bracket
Page 17 - Wheel arch liners
Page 18 - Tie bar failure, timing belt, engine mount
Page 19 - Exhaust layout
Page 20 - Cooling system filling
Tips for today -
We were asked for Libra windscreen info', it is from a pre 2000 Fiat Cinquecento.
Wheel hub studs are 12mm for Rover Metro & MGF hubs.
As the GTM Owners Club newsletter has a pointer towards this section of Simons website I will be reviewing the pages & updating where necessary.
My
apologies if some parts don't make
sense or if you want clarification
of any point please contact us.
If anyone wants any Libra
build info', pictures or guidance we will help if we can, especially as Peter at GTM passed away, he was a
valuable
source of information. GTM was then sold to RDM at
Coventry & it is now owned by Westfield. Things have
got more difficult now as GTM no longer
exsists, especially obtaining bespoke parts.
Just as a point of
interest the Libra has parts from many cars:-
Rover Metro basic donor
parts, steering rack (LHD), electrics wiring loom, in our case also seats
& sun visors. MGF drive shafts, Rover K series 1.8vvc (Lotus Elise
version), Vauxall Astra door handles, Landrover ball joints (in our
case Rover75 & Mercedes suspension bushes), VW ball joints.
We
saw how the factory used a purpose built jig to hold the monocoque, we
describe our version.
Simon did not want to
spend "years" building the car so this is the story about the "build",
written by me Barry.
The
first
Spark for building one, was set off when Simon saw one on a BBC Top
Gear
program, he set about researching the Kit Car market trying to convince
himself that he & I could build one. I kept saying to him, you buy
it & we will build it, brave words, but the build is not beyond
anyone
with some practical ability. In 1999 Simon was 27, and was a
metallurgist, working with stainless steel strip. I, Barry was
about
to retire after 43years as a Post Office/Royal Mail Engineer, on
telephones, mechanised/electronic mail sorting, finally ending as an
M&E supervisor for Royal Mail iT.
One
day I bought the June 1999 "Kit - Car" magazine which had a Red Libra
on
the front page, he was smitten.

Be aware of the order of construction, we stored all the glass fibre parts at the rear of the garage, the building took place in the centre area leaving some space near the door, for when the donor parts would arrive. We built a small trolly, 16"(405mm) long by 15"(380mm) wide, to stand the engine on, & allow us to move it easily. The materials to hand dictated the dimensions. Additional pieces of wood were fixed to it to suit the engine being moved. The trolley has two fixed wheels about 6"(150mm) in diameter & two substantial castors with 3"(75mm) wheels to allow easy turning. The donor kit was deliverd to us on 4th December 1999. See Photos A & B
The
SVA test, at Derby, was on 26th May 2000, first registration date was
1st
June 2000. It took eight months ten days to build, or 16 man months,
plus 20 man days as
there were two of us most of the time (no we did not work 24hour days,
& we did not keep a log of hours worked). Although the car is quite
small
when completed, a considerable amount of space is required to
store
the various body parts, as these cannot be fitted until all the
monocoque
mounted items are in place. i.e front & rear suspension, engine
frame,
fuel tank & all the pipework/cables under the car. Our available
space
was approx' 8.5m x 2.5m.
As
stated earlier we decided to "simply" replicate the factory jig idea.
Here
are
some details, there are four strong "jacking" points on the monocoque,
one at each corner. We therefore erected four uprights (50 x 50mm)
between
the floor & roof of the garage adjacent to each corner. To these we
attached four more half height uprights with a 50mm spacers plus a
thick
piece of cardboard. This was so that we could fit two cross members of
50 x 100mm, adjustable in height, using 10mm screwed rod pins so that
we
could adjust working height & clamp the cross members for
stability.
We also braced the uprights at floor level on each side so that we had
clear access from the front & rear, for trolley jack operations.
Eventually
the body will be lowered onto the engine!!!
Photos 2,3,4 &
6
may help clarify the above.
It
was also obvious that cutting & drilling of the glass fibre
"shells"
would require a vacuum cleaner. As we were tight for space we did not
want
to have to keep dragging a vacuum cleaner back & forth. We had an
Aqua
vac to hand, which we put out of the way under a shelf at the back of
the
garage. We used it's large pipe to connect to a piece of plastic drain
pipe over the centre line of the "work area" fixed to the garage roof.
We reduced the pipe in size & fitted a tee piece above the centre
of
the front windscreen position, (the car was facing the back of the
garage). The pipe was continued to an elbow just
above the rear bulkhead. Some joints just used plastic tape for a seal.
This gave us two positions where we could plug in, the smaller flexible
pipe. We had a bung, which we held in place with an elastic lugage
strap,
to cover whichever outlet was not in use. This arrangement can just be
seen in photos 6 & 8.
THE
MAIN THING YOU NEED TO BE AWARE OF, IS THAT AS YOU INCREASE THE WEIGHT
AT THE BACK OF THE MONOCOQUE, THE FRONT BECOMES VERY "LIGHT",
ESPECIALLY
WHEN YOU ADD THE ENGINE. Even at this stage it is still usefull to have
the car (monocoque) up in the air for connecting pipes etc. Eventually
it is also usefull to have some old standard Metro wheels to fit as a
temporary
measure, the ones we got had to be drilled out, then fit them the wrong
way around. Photo 10 shows them, not very clearly, one fitted one
removed.
This build was done using the 1.4 16v Mpi
engine - later on in the story it is replaced by the 1.8 16v 145ps vvc
engine (updated March 2018, the engine has proved to be a 145ps engine
not 160ps) & we understand that the version we got was the one
fitted
in the early versions of the Lotus Elise, although we did not know this
at the time, which is why we had trouble with the fitting of the clutch
slave cylinder.
.